Ramadan & Spring 2024 Progress Update

Ramadan Mubarak our dear Muslim brothers & sisters. May Allah (God) accept all of our worship in this blessed month. Alhamdulillah ICPV’s construction is continuing to steadily progress through your sincere duaa, support, and kind & generous donations both big & small. Jazakum Allahu kulla khair, and may Allah reward us all with a house in Jannah (Heaven).

Here the City of Portage are connecting the water main and meter pit.

Our Excavation crew have also successfully installed the commercial underground stormwater system cited in ICPV’s Civil Engineering plans as required by the City of Portage.

This is the SciCloneX Hydrodynamic Separator filter, which is a part of the whole stormwater system.

Here’s the catch Water Basin Rip Wrap.

A of nice view of the Stormwater runoff basin next to the Masjid’s foundation walls.

This is where part of the Portage Islamic Center & Masjid Parking Lot will be inshallah.


May Allah continue to bless this project. We look forward to praying in the Masjid with you all soon inshallah. Please continue to visit our blog to see all the new upcoming & exciting construction updates and progress.